Configuring Energy Baseline

2 min readUpdated

In this section, you will learn how to:

This process involves setting a baseline to measure the actual energy consumption against the expected values. Baseline can be defined for individual devices or units such as HVAC units, lighting, UPS, and so on. For example, if you define the baseline consumption as 1000 units per month, you can compare the actual consumption against this baseline to determine whether it exceeds or falls short of this baseline. This helps you to observe the consumption pattern and identify scope for improvement.

Defining a Baseline Tag

  1. In the Main Menu, under the ADMIN OPTIONS, in the Misc Config subsection, click Energy Baseline.
    ‎The Energy Baseline page is displayed with a list of devices or units for which baseline consumption has been defined.
  2. Click Add Baseline Tag.
    ‎The Add/Edit Baseline Tag pop-up window is displayed.
  3. Enter or select the required field information.
    Field Description

    Tag*

    Enter the name for this baseline.

    Cost*

    Select the cost to be used for calculating energy consumption.

  4. Click Save Baseline Tag.
    ‎The baseline tag for the particular unit/device is defined.

Modifying a Baseline Tag

  1. In the Main Menu, under the ADMIN OPTIONS, in the Misc Config subsection, click Energy Baseline.
    ‎The Energy Baseline page is displayed with a list of configured energy costs.
  2. Under the Actions column, click the Edit icon icon.
  3. In the Add/Edit Baseline Tag window, edit the fields as required. For details on field descriptions, see Adding an Energy Cost Configuration.
  4. Click Save Baseline Tag.
    ‎The baseline consumption for the particular unit/device is modified.

Setting a Baseline Cost

  1. In the Main Menu, under the ADMIN OPTIONS, in the Misc Config subsection, click Energy Baseline.
    ‎The Energy Baseline page is displayed with a list of devices or units for which baseline consumption has been defined.
  2. Under the Action column of the required baseline device, click Baseline.
  3. Click Add Baseline.
  4. Enter or select the required field information.
    Field Description

    Effective From*

    Select the date from which the baseline will be effective.

    Base KWH*

    Enter the expected consumption units for the selected baseline device.

    Baseline Tag*

    Displays the tag name of the selected baseline device.

  5. Click Save Baseline.
    ‎The baseline consumption for the particular unit/device is defined.

Editing Baseline Cost

  1. In the Main Menu, under the ADMIN OPTIONS, in the Misc Config subsection, click Energy Baseline.
    ‎The Energy Baseline page is displayed with a list of devices or units for which baseline consumption has been defined.
  2. Under the Action column of the required baseline device, click Baseline.
    ‎The page to edit the baseline cost is displayed.
  3. Under the Action column of the required date, click Edit icon.
  4. Edit the required information. ‎Refer to Setting a Baseline Cost for field descriptions, if needed
  5. Click Save Baseline.
    ‎The baseline consumption for the particular unit/device is updated.