Skip to content

Web Application - Admin User Manuals

Scheduling Reports

4 min readUpdated

In this section, you will learn how to:

You can schedule system-generated reports to be automatically mailed to a specific set of users on a scheduled basis. For example, you can schedule the weekly generation of the desk assignment report, allowing you to analyse desk usage and manage space and resource allocation more efficiently.

Creating a Report Schedule

  1. In the Main Menu, under the ADMIN OPTIONS, in the Reports subsection, click Report Scheduling.
    ‎The Report Scheduling page is displayed with existing scheduled reports, if any.
  2. Click Add Report Scheduler.
  3. On the Report Scheduling page, enter or select the required information.
    Field Description

    Name*

    Enter the name of the schedule report.

    Type*

    Select the type of the report you are scheduling for generation.

    Note: Based on the type of report selected, additional fields are displayed on the screen. For more details, click here.

    Description

    Enter a description for the scheduled report.

    Report File Name (without extension)

    Enter the file name for the report to be scheduled.

    Active

    Select this checkbox to make the scheduled report active.

    Email To

    Enter the email address of the users to whom this scheduled report should be sent.

    Email CC

    Enter the email address of the users to whom copies of this scheduled report should be sent.

    Scheduler Type*

    Select the type of schedule to be set for this report to be generated as:

    • Datewise: Allows you to select two specific dates on which the report will be scheduled for generation.
    • Daywise: Allows you to select the days of the week on which the report will be scheduled for generation.

    Date 1 Of The Month

    Enter the first date of the month when this report should be scheduled to be generated.

    Note: This option is displayed only when you select the Scheduler Type as Datewise.

    Date 2 Of The Month

    Enter the second date of the month when this report should be scheduled to be generated.

    Note: This option is displayed only when you select the Scheduler Type as Datewise.

    Scheduler Time*

    Enter or select the time at which the report will be scheduled for generation.

  4. Click Save Report Scheduler.
    ‎The report is scheduled.
  5. To add another report scheduler, click Add More Report Scheduler.

Uploading the Generated Report to the FTP Server

  1. In the Main Menu, under the ADMIN OPTIONS, in the Reports subsection, click Report Scheduling.
    ‎The Report Scheduling page is displayed with existing scheduled reports, if any.
  2. Click Add Report Scheduler.
  3. Enter or select the required information.

    Note: For more information, refer to Creating a Report Schedule.

  4. Select the Allow File Upload checkbox.
  5. Enter or select the following additional fields.
    Field Description

    Host*

    Enter the IP address of the FTP server.

    Protocol*

    Select the type of FTP server.

    Port*

    Enter the port of the FTP server.

    Username

    Enter the username of the FTP server.

    Password

    Enter the password of the FTP server.

    Extra Suffix

    Enter the suffix to be added to the filename when it is uploaded to the FTP server.

    Directory Path Where To Upload File

    Enter the directory path on the FTP server where the generated report should be uploaded.

    Encryption

    Enter encryption mechanism details

    Encryption Key File

    Upload file for encryption key.

  6. Click Save Report Scheduler.

Editing a Report Schedule

  1. In the Main Menu, under the ADMIN OPTIONS, in the Reports subsection, click Report Scheduling.
    ‎The Report Scheduling page is displayed with existing scheduled reports.
  2. Under the Action column, click the Edit icon icon.
    ‎The Report Scheduling page is displayed.
  3. Edit the required scheduling details. For information on fields and descriptions, refer Creating a Report Schedule.
  4. Click Save Report Scheduler.
    ‎The report schedule is updated.

Viewing the Scheduled Report History

If you have scheduled certain reports to be automatically generated at specific intervals of time, you can get an overview of all these scheduled reports.

  1. In the Main Menu, under the ADMIN OPTIONS, in the Reports subsection, click Report Scheduling.
    ‎The Report Scheduling page is displayed with existing scheduled reports.
  2. Under the Action column, click the Report List Report icon icon for the required scheduled report.
    ‎The Scheduled Report List Table pop-up window is displayed with details of days/dates on which the report was generated.

Downloading the Scheduled Report

  1. In the Main Menu, under the ADMIN OPTIONS, in the Reports subsection, click Report Scheduling.
    ‎The Report Scheduling page is displayed with existing scheduled reports.
  2. Under the Action column, click the Report List Report List icon icon for the required scheduled report.
    ‎The Scheduled Report List Table pop-up window is displayed with details of days/dates on which the report was generated.
  3. Under the Action column, click Download for the required report.
    ‎The report is downloaded.
Was this page helpful?