Skip to content

Web Application - Admin User Manuals

Scheduling Requests

4 min readUpdated

In this section, you will learn how to:

You can schedule requests for downloading log files, configuring the logging levels, rebooting devices, changing the device network configuration, and more. Once you have scheduled such a request, you can track the status of the request and also filter these scheduled requests.

Scheduling DM Requests

To schedule Device Management (DM) requests:

  1. In the Main Menu, under the ADMIN OPTIONS, in the Device subsection, click Upgrade & Request Scheduling.
    ‎The Upgrade & Request Scheduling page is displayed.
  2. In the left pane, click the campus Campus icon icon.
    ‎The Select Campus Data pop-up window opens.
  3. Select the required campus and building and click Done.
  4. Select the required floor.
    ‎The selected floor plan is displayed.
  5. Under the Schedule dropdown, select Schedule DM Request.
    ‎The Schedule DM Request pop-up is displayed.
  6. Enter or select the required information.
    Field Description

    Select Request Type*

    Select the type of request you want to schedule.

    Schedule Time*

    Select the date and time at which you want to schedule the request.

    Valid for Duration (Mins.)*

    Select the duration for which the scheduled request will be valid.

    Logs Of Which Date*

    Enter the date (in yyyy-mm-dd format) for which you are requesting the logs to be downloaded.

    Note: This field is displayed only when you select the request type as Download Log File.

    Logger Configuration*

    Enter a custom logger configuration or select one from the options available.

    Note: This field is displayed only when you select the request type as Set logging level.

    Level*

    Select the logging level to set for the request.

    Note: This field is displayed only when you select the request type as Set logging level.

  7. Click Request Schedule.
    ‎The request is scheduled and can be seen under the Scheduled Request tab.

Scheduling CM Requests

To schedule Configuration Management (CM) requests:

  1. In the Main Menu, under the ADMIN OPTIONS, in the Device subsection, click Upgrade & Request Scheduling.
    ‎The Upgrade & Request Scheduling page is displayed.
  2. In the left pane, click the campus Campus icon icon.
    ‎The Select Campus Data pop-up window opens.
  3. Select the required campus and building and click Done.
  4. Select the required floor.
    ‎The selected floor plan is displayed.
  5. Under the Schedule dropdown, select Schedule CM Request.
    ‎The Schedule CM Request pop-up is displayed.
  6. Enter or select the required information.
    Field Description

    Select Request Type*

    Select the type of request you want to schedule.

    Schedule Time*

    Select the date and time at which you want to schedule the request.

    Logs Of Which Date*

    Enter the date (in yyyy-mm-dd format) for which you are requesting the logs to be downloaded.

    Note: This field is displayed only when you select the request type as Download Log File.

    Valid for Duration (Mins.)*

    Select the duration for which the scheduled request will be valid.

    Logger Configuration*

    Enter a custom logger configuration or select one from the options available.

    Note: This field is displayed only when you select the request type as Set logging level.

    Level*

    Select the logging level to set for the request.

    Note: This field is displayed only when you select the request type as Set logging level.

  7. Click Request Schedule.
    ‎The request is scheduled and can be seen under the Scheduled Request tab.

Scheduling Bacnet Requests

To schedule a Bacnet request:

  1. In the Main Menu, under the ADMIN OPTIONS, in the Device subsection, click Upgrade & Request Scheduling.
    ‎The Upgrade & Request Scheduling page is displayed.
  2. In the left pane, click the campus Campus icon icon.
    ‎The Select Campus Data pop-up window opens.
  3. Select the required campus and building and click Done.
  4. Select the required floor.
    ‎The selected floor plan is displayed.
  5. Under the Schedule dropdown, select Schedule Bacnet Request.
    ‎The Schedule Bacnet Request pop-up is displayed.
  6. Enter or select the required information.
    Field Description

    Select Bacnet*

    Select the Bacnet device for which you want to schedule the request.

    Select Request Type*

    Select the type of request you want to schedule.

    Schedule Time*

    Select the date and time at which you want to schedule the request.

    Valid for Duration (Mins.)*

    Select the duration for which the scheduled request will be valid.

    Logs Of Which Date*

    Enter the date for which you are requesting the logs to be downloaded.

    Note: This field is displayed only when you select the request type as Download Log File.

    Logger Configuration*

    Enter a custom logger configuration or select from the options available.

    Note: This field is displayed only when you select the request type as Set logging level.

    Level*

    Select the logging level to set for the request.

    Note: This field is displayed only when you select the request type as Set logging level.

  7. Click Request Schedule.
    ‎The request is scheduled and can be seen under the Scheduled Request tab.
Was this page helpful?